PROJECT: Land Development

Obendorf Hop Facility

Parma, Idaho

Client

Obendorf Farms

Construction Value:

Overview:

Obendorf Farms hired T-O Engineers to assist in increasing the capacity of their hop processing facilities, including three separate buildings; hop picker, dryer and cooler buildings. The buildings covered approximately 100,000 square feet on approximately five acres. T-O Engineers provided engineering and surveying services including the establishment of the boundary, topographical survey, and site layout and grading to accommodate loading and unloading, site design, storm drainage, construction staking and permitting with the County. The project included coordination between the existing uses, agriculture, and the new proposed industrial process located within an agricultural area. 

T-O Engineers’ successful services have resulted in multiple repeat assignments in 2016 and 2017 with future work planned for 2018.

Services Provided:

  • Boundary & topographical survey
  • Site layout and grading
  • Site design
  • Storm drainage
  • Construction staking and permitting